Today, the city of Cleveland announced that it was awarded $69.3 million from the U.S. Department of Transportation (USDOT) for its ambitious downtown lakefront redevelopment. This is the second major federal grant for the downtown lakefront since October when the city was awarded $59.7 million from the USDOT. Construction is due to start in 2027.
Together, the two large grant awards total $129 million and will expand the work that the city can do to revamp the Shoreway highway (Ohio Route 2) into a Downtown Boulevard so a North Coast Connector land bridge can be built over the railroad tracks and boulevard. It will link Downtown Cleveland’s central business district with a lakefront redesigned with park facilities, other public spaces and other development.
City officials have stated that the lakefront redevelopment will go forward with our without Cleveland Browns home games being played at Huntington Bank Field. The Browns are taking steps to relocate their home games to a planned enclosed stadium in suburban Brook Park.
“We are thrilled to receive this transformative investment from the U.S. Department of Transportation for the North Coast Connector Project,” Cleveland Mayor Justin Bibb said in a written statement. “This funding represents a pivotal step in our mission to reimagine the waterfront and enhance accessibility for all Clevelanders.”
Photo Caption: This map shows the major infrastructure features for which the city is seeking funding to building. Total cost of these is estimated at about $450 million. With today’s announcement, it brings the total raised to $150 million — enough to start construction on the Shoreway boulevard elements from East Ninth Street west (FO).
The Reconnecting Communities program is new, resulting from the Bipartisan Infrastructure Law passed by Congress in 2021. Its construction grants are to remove, retrofit, mitigate or replace an existing eligible transportation facility with a new facility that reconnects communities. It was created after many communities complained of being divided by poorly designed or unnecessary highways which might instead be rebuilt as lower capacity, less-divisive boulevards.
“I am extremely grateful to our dedicated congressional delegation, especially former U.S. Senator Sherrod Brown and Congresswoman Shontel Brown, whose steadfast dedication, support and advocacy have been instrumental in bringing this grant to our city,” Bibb added.
Stay Up-to-Date With the Cleveland Magazine Daily Newsletter Six Days a Week
To build the North Coast Connector requires lowering the Shoreway between West Third and East Ninth streets. Here, the Shoreway is rising and curving south on a bridge over the lakefront tracks and several downtown streets before crossing the Cuyahoga River valley on a separate, mile-long bridge — Ohio’s longest.
A lakefront multimodal transportation center with structured parking plus a hub for Greater Cleveland Regional Transit Authority buses and trains as well as Amtrak passenger trains also is planned. So is a streetscape along the new boulevard and existing, nearby streets. Total cost of the land bridge, Shoreway reconfiguration, multimodal hub and streetscape enhancements is estimated at nearly $450 million.
Photo Caption: This Shoreway bridge over the lakefront tracks will be removed and replaced with a Downtown Boulevard with intersections at West 3rd and East Ninth streets, plus a future intersection with a to-be-extended East 18th Street (Google).
Today’s $69,291,428 grant came from USDOT’s Reconnecting Communities Pilot grant program. October’s came from its Rebuilding America (INFRA) program. The latter will actually be provided in two annual installments — $38,537,761 and $21,181,506, for a total of $59,719,267, said U.S. Rep. Shontel Brown (D-11).
“I am proud to join Mayor Bibb in announcing this significant federal funding for our city,” Brown added. “The North Coast Connector and the Mayor’s broader Shore-to-Core-to-Shore initiative are transformational initiatives that will help us capitalize on our lakefront, strengthen our economy, and position Cleveland to thrive for decades to come.”
“We believe in downtown Cleveland,” she said. “Visionary projects like this are not possible without visionary leaders locally and nationally. The Biden-Harris Administration has believed in Northeast Ohio from the start, and as their administration comes to an end, they have made another investment in our future. Congratulations to everyone with the City who worked on this application, this was a highly competitive grant opportunity and my office was honored to support the bid.”
Photo Caption: Before and after images of what the Shoreway will look like after it is turned into a Downtown Boulevard. This and other lakefront investments will go forward regardless of whether the football stadium remains here or not (FO).
Those grant awards will add to local and state funds already raised. Scott Skinner, executive director of the new North Coast Waterfront Development Corp. which is overseeing lakefront development, said in an email today to downtown lakefront stakeholders that enough funds have been raised to start final engineering and construction.
“This puts our total funds raised this year at $150 million and means that we are able to move forward with the enabling infrastructure that will facilitate equitable connectivity and economic development on our lakefront,” Skinner said. “While there is still a lot of work to do until we are shovels in the ground in 2027, having these funds allocated to the project is an enormous milestone.”
For more updates about Cleveland, sign up for our Cleveland Magazine Daily newsletter, delivered to your inbox six times a week.
Cleveland Magazine is also available in print, publishing 12 times a year with immersive features, helpful guides and beautiful photography and design.